Clean Air Engineering Maritime
Client
Gunderson Marine / Elliott Bay Design Group
Delivery
2023
Vessel
TBD
Project Overview
Piping and Steel Outfit Production model for a diesel emissions removal barge.
Delivery
Review of the systems for functionality and develop a Ship Constructor production model for delivery of the following:
Piping:
- Pipe Routing and pipe supports modelling.
- Pipe spool drawings for fabrication
- Pipe installation arrangement drawings.
HVAC deck penetrations,
Steel outfitting assembly drawings for
- Handrails
- Elevated platforms and walkways





